Silo Riedel
Request transport
HomeServicesBackfilling & Ballast

Backfilling & Ballast Clean. Precise. Site-ready.

Wherever there is building work, more than concrete and mortar is needed. Many construction projects call for special bulk material work such as backfilling foundations, levelling floor surfaces or gravel ballasting of roof areas. That is exactly where we come in.

With our specialised equipment we do not just deliver the material, we bring it directly to the point of use, efficiently, cleanly and with minimal staff and machinery needed on site.

Our equipment: flexible, powerful, site-proven

  • Delivery by tipping silo with up to 60 m³ capacity
  • Application via a hose system up to 150 m long
  • High-performance compressor for precise material delivery
  • Fast set-up and dismantling, minimal standing times
Foundations, cavities, structures: backfilled with a system

Foundations, cavities, structures: backfilled with a system

We handle the precise backfilling of foundations and strip foundations, cavities between masonry, pipework or components as well as technical shafts and building plinths. In doing so we ensure even distribution, exact volume control and clean workmanship, even in hard-to-reach areas.

Floor levelling before the screed: fast and load-bearing

Floor levelling before the screed: fast and load-bearing

Before the screed is laid, floor levels and joints in the shell construction often have to be evened out. We supply the right material and apply it efficiently across the surface, with no need for elaborate interim storage or manual distribution. That saves time, reduces site traffic and creates an even base on which work can continue straight away.

Gravel ballasting of roof surfaces: gentle and precise

Gravel ballasting of roof surfaces: gentle and precise

For flat roofs and roof build-ups we carry out gravel ballasting as a surcharge load or protective layer, applied directly onto the roof with high-performance equipment. No crane needed, even distribution, heights up to the 7th floor, fast execution even on large areas.

Your contact

Let’s talk
about your project.

You will get a concrete offer, for electric transports including the expected CO₂ savings.

Markus Halsegger

Markus Halsegger

Silo dispatcher, Graz